A rope connects

Teamwork, logical thinking and time planning

Which team built a bridge first?
Does it fulfil the safety requirements and the time limit?
Who has the most play money at the end?

Everyone in the team is challenged here!

It is also possible to combine the whole thing with cost planning and a safety audit. This simulates the day-to-day running of a project.

Time required
3-4 hrs.

Requirements
No knowledge necessary. Everyone can take part in the team and show off their skills.

Costs
From CHF 80 per person (depending on group size)

Locations
For example in Gadmen on the Susten Pass road, in the beautiful Haslital. Followed by a fine aperitif or meal at the Susten Pass Alpine Centre.

Reviews

Local weather

overcast clouds

8°C

Friday

  • Sunrise: 06:08
  • Sunset: 20:38
  • Max: 9°C
  • Min: 7°C
  • Humidity: 62 %
  • Pressure: 1016 hPa
  • Wind: 13 km/h
  • Saturday
    • 10°C
    • -1°C
  • Sunday
    • 13°C
    • 4°C
  • Monday
    • 11°C
    • 5°C

A rope connects

To the website